lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog
$18.49
Price: $18.49
(as of Jan 21,2025 19:04:00 UTC – Details)
To calculate the overall star rating and percentage breakdown by star, we don’t use a simple average. Instead, our system considers things like how recent a review is and if the reviewer bought the item on Amazon. It also analyzed reviews to verify trustworthiness.
Is Discontinued By Manufacturer : No
Product Dimensions : 360 x 0.38 x 0.38 inches; 1.06 Ounces
Date First Available : October 10, 2019
Manufacturer : Keenleader.,ltd.
ASIN : B07VJ8FYCD
NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won’t get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
User Reviews
Be the first to review “lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog”
$18.49
There are no reviews yet.