Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs

Add your review

$19.98

Tag:

$19.98

Add to wishlistAdded to wishlistRemoved from wishlist 0
Add to compare


Price: $19.98
(as of Apr 24,2024 03:44:36 UTC – Details)


To calculate the overall star rating and percentage breakdown by star, we don’t use a simple average. Instead, our system considers things like how recent a review is and if the reviewer bought the item on Amazon. It also analyzed reviews to verify trustworthiness.

Package Dimensions ‏ : ‎ 8.1 x 5 x 1.8 inches; 1 Pounds
Item model number ‏ : ‎ 01
Date First Available ‏ : ‎ April 17, 2020
Manufacturer ‏ : ‎ NIMBLE
ASIN ‏ : ‎ B085ZRXGLP
Country of Origin ‏ : ‎ China

Waterproof :100% environmentally friendly PVC material made the waterproof dog leash and not as heavy as other nylon leash when wet .This material is also weatherproof and very easy to clean!
Heavy Duty: The leash are soft, flexible, comfortable and smell-free.Strong tensile resistance can carry 600 lbs pull force and not easy to rip and can be used in all kinds of weather conditions. Give your dogs more comfortable and fresh!
Multi color&size: We have many different colors and sizes to choose from. Pink / Blue / Orange / Black by width 3/5 inch with length 5FT /10FT /15FT /30FT/ 50FT.
100% MONEY BACK GUARANTEE – Feel free to contact us if you have any questions.No matter you and your dog not like this dog leash or size, no problem, get your money back or instead to a new one!

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs”

Your email address will not be published. Required fields are marked *

Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs
Waterproof Dog Training Leash 50FT 30FT 15FT 10FT 5FT Heavy Duty Recall Long Lead for Large Medium Small Dogs

$19.98

Yes We Pets
Logo
Enable registration in settings - general
Compare items
  • Total (0)
Compare
0
Shopping cart